Intro blurb…

Road Construction

Experienced and highly skilled in the formation of forestry and wind farm access roads. We undertake the entire operation – from excavation and extraction of existing material to formation level, to grading the finished surface –using material won on-site or imported from our own quarries.

Road Surfacing

We operate our own surfacing squad undertaking various highway works, including resurfacing and carriageway widening and realignment.

Bridge Construction

Highly proficient in forestry bridge construction. Formation of foundations, using fully designed formwork systems to pour reinforced concrete abutments before installation of concrete and timber decks.<br /> <br /> We have previously used Legato™ interlocking blocks to form abutments as well as pouring in-situ reinforced structures. Bridge structures range from 8m to 36m span, with different deck and abutment designs to suit the topography of the site. <br />

Related Case Study

Glen Orchy Bridge Replacement

Client: Forestry & Land Scotland

View Case Study

Our Accreditations